Events

ARTICLE

Call of Duty Mobile Codes February 2026: Crew Tag

DonQuijote

2 months ago

246

3

0

During the month of February, Call of Duty: Mobile runs the limited-time event “Va De Crews”, an initiative that integrates Latin American content creators and their communities directly into the game. The event combines special missions with the use of external codes shared by the creators themselves (available at the end of the article), allowing players to unlock exclusive cosmetic rewards associated with each crew.

What is the “Va De Crews” event about?

“Va De Crews” is a limited-time event available from January 28 to February 25. Its goal is to directly connect selected content creators with the Call of Duty: Mobile experience, allowing players to choose a crew represented by one of them.

Once a crew is selected, players gain access to special missions that unlock progressively. Unlike other in-game events, progression does not rely solely on playing matches, but also on entering specific codes that are not published within the game itself, but instead are shared by creators through their external platforms.

Explore the treasure map and find rewards in La Garra

How the February codes work

Progress within the “Va De Crews” event is based on special codes that are released in stages throughout February. Each participating creator shares three different codes, and each one unlocks a specific phase of the event.

Code release schedule:

  • First code: available between January 28 and February 1, already available at the end of this article.
  • Second code: available from February 2 to February 7.
  • Third code: available from February 8 to February 13.

These codes are not universal and do not appear on official in-game channels. To obtain them, players must actively follow the creator of their chosen crew, as the codes are shared through posts, live streams, or social media content.

Participating creators and regional focus

The event features the participation of several Latin American content creators, selected for their close connection with the Call of Duty: Mobile community in the region.

The participating creators are:

  • Rey Tamalero
  • OqueiOquei
  • TTGirl
  • LoboJZ
  • Vic Medina

Each creator represents a specific crew within the event. Choosing a creator determines both the available missions and the cosmetic rewards that can be unlocked, reinforcing a sense of belonging to a specific community.

Available rewards in the event

The rewards offered in “Va De Crews” are exclusively cosmetic and do not affect the competitive balance of the game. Their purpose is visual and representative, allowing players to show their affiliation with a specific crew.

The available rewards include:

  • Themed avatars
  • Calling cards (player profile cards)
  • Exclusive sprays for use during matches

All of these items are only available during the event’s active period.

Step by step: how to redeem codes in COD Mobile

To redeem the “Va De Crews” event codes, players must follow these steps within the game:

  1. Log in to Call of Duty: Mobile.
  2. Access the main menu and enter the Events section.
  3. Locate the “Va De Crews” event banner.
  4. Select the option to enter the code.
  5. Type the code exactly as shared by the creator.
  6. Confirm the redemption and verify that the mission or reward is activated.

The following “Va De Crews” codes are currently active and can be redeemed in-game during their validity period (until February 1):

  • Tamales914
  • Ositos64622
  • OjoPiojo741
  • Auuuuu194
  • Victacilinos880

Each code can only be redeemed during its corresponding validity period. Once the deadline has passed, the system no longer allows activation.

Explore the treasure map and find rewards in La Garra

3

0

NEWSLETTER

Subscribe!

And find out the latest news

Etiquetas

códigos cod mobilecall of duty mobileevento va de crewscreadores de contenidorecompensas cosméticascódigos especialesmisiones especialescomunidad latinoamericanacreadores participantesavatares temáticoscalling cardssprays exclusivoscanjear códigosevento temporalrecompensas exclusivascontenido en redes sociales

Join our community

© Ola GG. All rights reserved 2026.